{"data":{"id":"us/44-cfr-63.6","jurisdiction":"us","citation":"44 CFR 63.6","heading":"Reimbursable relocation costs.","body":"In addition to the coverage described in § 63.5 of this part, relocation costs for which benefits are payable under section 1306(c) of the Act include the costs of:\n(a) Removing the structure from the site,\n(b) Site cleanup,\n(c) Debris removal,\n(d) Moving the structure to a new site, and\n(e) At the new site, a new foundation and related grading, including elevating the structure as required by local flood plain management ordinances, and sewer, septic, electric, gas, telephone, and water connections at the building.","path":["Title 44—Emergency Management and Assistance","CHAPTER I—FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER B—INSURANCE AND HAZARD MITIGATION","PART 63—IMPLEMENTATION OF SECTION 1306(c) OF THE NATIONAL FLOOD INSURANCE ACT OF 1968","Subpart A—General"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-44.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:15Z","sha256":"b4011a645ec4e8b53b4851b93d129a61217fcdea21e15c3dd67d159c266a6cce","source_id":"us-cfr","stale":true,"prev":"us/44-cfr-63.5","next":"us/44-cfr-63.7"},"notice":"GroundRules: Original legal text. Not legal advice."}
