{"data":{"id":"us/46-cfr-111.10-3","jurisdiction":"us","citation":"46 CFR 111.10-3","heading":"-3 Two generating sources.","body":"In addition to the emergency power sources required under part 112 of this chapter, each self-propelled vessel and each mobile offshore drilling unit must have at least two electric generating sources.","path":["Title 46—Shipping","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER J—ELECTRICAL ENGINEERING","PART 111—ELECTRIC SYSTEMS—GENERAL REQUIREMENTS","Subpart 111.10—Power Supply"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-46.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:22Z","sha256":"d8496b1ebacd862e511da086032961fb64d33720ed8ca26e1de2493693885130","source_id":"us-cfr","stale":true,"prev":"us/46-cfr-111.10-1","next":"us/46-cfr-111.10-4"},"notice":"GroundRules: Original legal text. Not legal advice."}
