{"data":{"id":"us/46-cfr-112.15-10","jurisdiction":"us","citation":"46 CFR 112.15-10","heading":"-10 Loads on systems without a temporary emergency power source.","body":"If there is no temporary emergency power source, the loads under § 112.15-1 must be arranged so that they can be energized from the final emergency power source.","path":["Title 46—Shipping","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER J—ELECTRICAL ENGINEERING","PART 112—EMERGENCY LIGHTING AND POWER SYSTEMS","Subpart 112.15—Emergency Loads"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-46.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:22Z","sha256":"fc62e9eb2f9d07d8e9846874715bddd8ed3484fe3c61aa03dc20ac8c5a986062","source_id":"us-cfr","stale":true,"prev":"us/46-cfr-112.15-5","next":"us/46-cfr-112.20-1"},"notice":"GroundRules: Original legal text. Not legal advice."}
