{"data":{"id":"us/46-cfr-112.20-3","jurisdiction":"us","citation":"46 CFR 112.20-3","heading":"-3 Normal source for emergency loads.","body":"(a) The normal source for emergency loads must be the ship's service generating plant.\n(b) The power from the ship's service generating plant for the emergency loads must be supplied to the emergency switchboard through automatic transfer switches.","path":["Title 46—Shipping","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER J—ELECTRICAL ENGINEERING","PART 112—EMERGENCY LIGHTING AND POWER SYSTEMS","Subpart 112.20—Emergency Systems Having a Temporary and a Final Emergency Power Source"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-46.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:22Z","sha256":"af32e66b184585997a94a0079ef8d86ae2c91ab19d3a5625fa6fc9457ffbcc18","source_id":"us-cfr","stale":true,"prev":"us/46-cfr-112.20-1","next":"us/46-cfr-112.20-5"},"notice":"GroundRules: Original legal text. Not legal advice."}
