{"data":{"id":"us/46-cfr-112.30-10","jurisdiction":"us","citation":"46 CFR 112.30-10","heading":"-10 Restoration of normal source potential.","body":"When the potential from the normal source is restored to 85 to 95 percent of its normal value, the emergency loads must transfer automatically to the normal source.","path":["Title 46—Shipping","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER J—ELECTRICAL ENGINEERING","PART 112—EMERGENCY LIGHTING AND POWER SYSTEMS","Subpart 112.30—Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-46.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:22Z","sha256":"361b27219735a2fbe78945dd5c2ff9280f033fdb62df7b8ec4613fca6f2d008d","source_id":"us-cfr","stale":true,"prev":"us/46-cfr-112.30-5","next":"us/46-cfr-112.35-1"},"notice":"GroundRules: Original legal text. Not legal advice."}
