{"data":{"id":"us/46-cfr-112.35-3","jurisdiction":"us","citation":"46 CFR 112.35-3","heading":"-3 Normal source for emergency loads.","body":"The normal source for emergency loads must be the ship's service generating plant.","path":["Title 46—Shipping","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER J—ELECTRICAL ENGINEERING","PART 112—EMERGENCY LIGHTING AND POWER SYSTEMS","Subpart 112.35—Manually Controlled Emergency Systems Having a Storage Battery or a Diesel Engine or Gas Turbine Driven Generator as the Sole Emergency Power Source"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-46.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:22Z","sha256":"c7d3bf33bedf9d88e4968c1c691ecea0c448b885100c907d5a575db0b5545699","source_id":"us-cfr","stale":true,"prev":"us/46-cfr-112.35-1","next":"us/46-cfr-112.35-5"},"notice":"GroundRules: Original legal text. Not legal advice."}
