{"data":{"id":"us/46-cfr-112.55-1","jurisdiction":"us","citation":"46 CFR 112.55-1","heading":"-1 General.","body":"Each storage battery installation must meet Subpart 111.15 of this chapter.","path":["Title 46—Shipping","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER J—ELECTRICAL ENGINEERING","PART 112—EMERGENCY LIGHTING AND POWER SYSTEMS","Subpart 112.55—Storage Battery Installation"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-46.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:22Z","sha256":"2ebbbc566de1f53282963e5b404a8056903c2a1004e1bdf4baff3b3f1e874821","source_id":"us-cfr","stale":true,"prev":"us/46-cfr-112.50-7","next":"us/46-cfr-112.55-5"},"notice":"GroundRules: Original legal text. Not legal advice."}
