{"data":{"id":"us/46-cfr-119.100","jurisdiction":"us","citation":"46 CFR 119.100","heading":"Intent; preemptive effect.","body":"This part contains requirements for the design, construction, installation, and operation of propulsion and auxiliary machinery, piping and pressure systems steering apparatus, and associated safety systems. Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. The regulations in this part have preemptive effect over State or local regulations in the same field.","path":["Title 46—Shipping","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER K—SMALL PASSENGER VESSELS CARRYING MORE THAN 150 PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS","PART 119—MACHINERY INSTALLATION","Subpart A—General Provisions"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-46.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:22Z","sha256":"05bf18837522cb22ac6a9c7851ec34b91c26e93e2b5834845493d869ed03ec04","source_id":"us-cfr","stale":true,"prev":"us/46-cfr-118.600","next":"us/46-cfr-119.115"},"notice":"GroundRules: Original legal text. Not legal advice."}
