{"data":{"id":"us/46-cfr-153.1500","jurisdiction":"us","citation":"46 CFR 153.1500","heading":"Venting system rupture disks.","body":"The master shall ensure that a relief valve exposed to a cargo after the failure of a rupture disk or breaking pin is cleaned and operates properly before the next cargo is loaded into the tank.","path":["Title 46—Shipping","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER O—CERTAIN BULK DANGEROUS CARGOES","PART 153—SHIPS CARRYING BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS","Subpart C—Operations"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-46.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:22Z","sha256":"7b3be3b15202c093f7c02d4d4cd3c513f1bd461557e955ca6eeffc96c5c6e183","source_id":"us-cfr","stale":true,"prev":"us/46-cfr-153.1132","next":"us/46-cfr-153.1502"},"notice":"GroundRules: Original legal text. Not legal advice."}
