{"data":{"id":"us/46-cfr-159.005-12","jurisdiction":"us","citation":"46 CFR 159.005-12","heading":"-12 Plans.","body":"(a) Each set of plans under § 159.005-9(a)(5)(ii) for equipment must include the following:\n(1) An assembly drawing or general arrangement drawing.\n(2) A description of each component of the equipment that includes the name, the manufacturer, and the part identification of each component in—\n(i) A detail drawing;\n(ii) A bill of material or parts list; or\n(iii) A specification for that component.\n(3) A list of the drawings and specifications in the set of plans, including each revision, and the date of that list.\n(4) If a manufacturer's instructions or manual is required in the applicable subpart, a copy of the instructions or manual.\n(b) [Reserved]","path":["Title 46—Shipping","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER Q—EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL","PART 159—APPROVAL OF EQUIPMENT AND MATERIALS","Subpart 159.005—Approval Procedures"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-46.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:22Z","sha256":"896d59996af3049efc3b2e706323531e3927d3f5c6d37cfe7fa2cd27e2b2eb5d","source_id":"us-cfr","stale":true,"prev":"us/46-cfr-159.005-11","next":"us/46-cfr-159.005-13"},"notice":"GroundRules: Original legal text. Not legal advice."}
