{"data":{"id":"us/46-cfr-162.060-18","jurisdiction":"us","citation":"46 CFR 162.060-18","heading":"-18 Suspension, withdrawal, or termination of approval.","body":"The Coast Guard may suspend an approval issued under this subpart or alternate management system (AMS) determination issued under 33 CFR 151.2026(d) of a ballast water management system (BWMS) in accordance with 46 CFR 2.75-40, withdraw an approval or AMS determination in accordance with 46 CFR 2.75-50(a), or terminate an approval or AMS determination in accordance with 46 CFR 2.75-50(b) if the BWMS or AMS, as manufactured—\n(a) Is found non-compliant with the conditions of approval;\n(b) Is unsuitable for the purpose intended by the manufacturer;\n(c) Does not meet the requirements of applicable laws, rules, and regulations, and other Federal requirements when installed and operated as intended by the manufacturer; or\n(d) Cannot be maintained to operate as designed, due to lack of parts or necessary support services.","path":["Title 46—Shipping","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER Q—EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL","PART 162—ENGINEERING EQUIPMENT","Subpart 162.060—Ballast Water Management Systems"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-46.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:22Z","sha256":"8aab9894cc7c5105888292e40d3371608a256ea2c95b734b7610d5bc945622e7","source_id":"us-cfr","stale":true,"prev":"us/46-cfr-162.060-16","next":"us/46-cfr-162.060-20"},"notice":"GroundRules: Original legal text. Not legal advice."}
