{"data":{"id":"us/46-cfr-164.003-5","jurisdiction":"us","citation":"46 CFR 164.003-5","heading":"-5 Procedure for approval.","body":"(a) Processed kapok is not subject to formal approval, but will be accepted by the inspector on the basis of this subpart for use in the manufacture of lifesaving equipment utilizing it.\n(b) [Reserved]","path":["Title 46—Shipping","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER Q—EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL","PART 164—MATERIALS","Subpart 164.003—Kapok, Processed"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-46.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:22Z","sha256":"8692b312c04e813840f4851c5f353a315d149a6baf16b0a29a358caef8cde601","source_id":"us-cfr","stale":true,"prev":"us/46-cfr-164.003-4","next":"us/46-cfr-164.006-1"},"notice":"GroundRules: Original legal text. Not legal advice."}
