{"data":{"id":"us/46-cfr-173.007","jurisdiction":"us","citation":"46 CFR 173.007","heading":"Location of the hook load.","body":"When doing the calculations required in this subpart, the hook load must be considered to be located at the head of the crane.","path":["Title 46—Shipping","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER S—SUBDIVISION AND STABILITY","PART 173—SPECIAL RULES PERTAINING TO VESSEL USE","Subpart B—Lifting"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-46.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:22Z","sha256":"746b43fb9adfc25fd5d99bb9faff076883bfa6ae51ebe09c06f11c0388f1619d","source_id":"us-cfr","stale":true,"prev":"us/46-cfr-173.005","next":"us/46-cfr-173.010"},"notice":"GroundRules: Original legal text. Not legal advice."}
