{"data":{"id":"us/46-cfr-30.10-37","jurisdiction":"us","citation":"46 CFR 30.10-37","heading":"-37 Keel laying date—TB/ALL.","body":"The term keel laying date means the date upon which progressive construction identifiable with a specific vessel begins, including construction of the first module or prefabricated section of the hull that is identifiable with that vessel.","path":["Title 46—Shipping","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER D—TANK VESSELS","PART 30—GENERAL PROVISIONS","Subpart 30.10—Definitions"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-46.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:22Z","sha256":"2785ee15dcb713782a17a4a814f1693303d48ffb01ff2f4158cf1fd398b2b479","source_id":"us-cfr","stale":true,"prev":"us/46-cfr-30.10-35","next":"us/46-cfr-30.10-38"},"notice":"GroundRules: Original legal text. Not legal advice."}
