{"data":{"id":"us/46-cfr-31.25-1","jurisdiction":"us","citation":"46 CFR 31.25-1","heading":"-1 Load lines required—TB/OCL.","body":"All tank vessels of 150 gross tons or over, or 79 feet in length or greater, navigating the oceans, coastwise waters, and Great Lakes are subject to the regulations in parts 42 to 45, inclusive, subchapter E (Load Lines), of this chapter, as applicable.","path":["Title 46—Shipping","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER D—TANK VESSELS","PART 31—INSPECTION AND CERTIFICATION","Subpart 31.25—Load Lines"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-46.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:22Z","sha256":"6f0bcb36fff8ff6c7155725cf31abab2764e504044ee495e25ea29250ebcc93f","source_id":"us-cfr","stale":true,"prev":"us/46-cfr-31.20-1","next":"us/46-cfr-31.30-1"},"notice":"GroundRules: Original legal text. Not legal advice."}
