{"data":{"id":"us/46-cfr-32.45-1","jurisdiction":"us","citation":"46 CFR 32.45-1","heading":"-1 Installation and details.","body":"The installation of all electrical engineering or interior communications systems, together with the details of design, construction, and installation, must meet the requirements of subchapter J (Electrical Engineering Regulations) of this chapter.","path":["Title 46—Shipping","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER D—TANK VESSELS","PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS","Subpart 32.45—Electrical Installations"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-46.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:22Z","sha256":"66c1862adc6679ef4f60559aa10594df4a70b0f4d389e1c9370d63ed5be201e7","source_id":"us-cfr","stale":true,"prev":"us/46-cfr-32.40-65","next":"us/46-cfr-32.50-1"},"notice":"GroundRules: Original legal text. Not legal advice."}
