{"data":{"id":"us/46-cfr-404.105","jurisdiction":"us","citation":"46 CFR 404.105","heading":"Ratemaking step 5: Project needed revenue.","body":"The Director calculates each pilotage association's base projected needed revenue by adding the projected adjusted operating expenses from § 404.102 (step 2) and the total target pilot compensation from § 404.104 (step 4).","path":["Title 46—Shipping","CHAPTER III—COAST GUARD (GREAT LAKES PILOTAGE), DEPARTMENT OF HOMELAND SECURITY","PART 404—GREAT LAKES PILOTAGE RATEMAKING"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-46.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:22Z","sha256":"0802b1dabcd58dce3c26d249d9e9ac8f06108c788c8d8c6858c1137b1f7f0c6e","source_id":"us-cfr","stale":true,"prev":"us/46-cfr-404.104","next":"us/46-cfr-404.106"},"notice":"GroundRules: Original legal text. Not legal advice."}
