{"data":{"id":"us/46-cfr-42.13-45","jurisdiction":"us","citation":"46 CFR 42.13-45","heading":"-45 Verification of marks.","body":"(a) The International Load Line Certificate (1966) shall not be delivered to the vessel until § 42.07-5 has been fully complied with under the authority and provisions of subparts 42.07 and 42.09 of this part.","path":["Title 46—Shipping","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER E—LOAD LINES","PART 42—DOMESTIC AND FOREIGN VOYAGES BY SEA","Subpart 42.13—General Rules for Determining Load Lines"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-46.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:22Z","sha256":"fdfd2de0eb915c7d30edf47fb5e87d0dd77d6d964da8f450366dfd57dda4cd47","source_id":"us-cfr","stale":true,"prev":"us/46-cfr-42.13-40","next":"us/46-cfr-42.15-1"},"notice":"GroundRules: Original legal text. Not legal advice."}
