{"data":{"id":"us/46-cfr-45.119","jurisdiction":"us","citation":"46 CFR 45.119","heading":"Freeing port area: Changes from standard sheer.","body":"The freeing port area required by § 45.117(b) must be multiplied by the factor in the following table 5 if the sheer differs from the standard sheer defined in § 45.63. table 4.\nTable 5\nFreeing port area: Sheer correction.\nRatio of sums of actual sheer ord./std. sheer ord. Greater than: Multiplier for area required by § 45.117(b)\n1.0 1.0\n1.0 1.00\n0.9 1.05\n0.8 1.10\n0.7 1.15\n0.6 1.20\n0.5 1.25\n0.4 1.30\n0.3 1.35\n0.2 1.40\n0.1 1.45\nNo sheer 1.50","path":["Title 46—Shipping","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER E—LOAD LINES","PART 45—GREAT LAKES LOAD LINES","Subpart D—Conditions of Assignment"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-46.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:22Z","sha256":"3a00300144d0f0c828d4b17905dae1f12bb19b896f853d1a498fa0eb3e848533","source_id":"us-cfr","stale":true,"prev":"us/46-cfr-45.117","next":"us/46-cfr-45.121"},"notice":"GroundRules: Original legal text. Not legal advice."}
