{"data":{"id":"us/46-cfr-52.20-17","jurisdiction":"us","citation":"46 CFR 52.20-17","heading":"-17 Opening between boiler and safety valve (modifies PFT-44).","body":"Discharge pipes must be installed in accordance with the requirements of § 52.01-105.","path":["Title 46—Shipping","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER F—MARINE ENGINEERING","PART 52—POWER BOILERS","Subpart 52.20—Requirements for Firetube Boilers"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-46.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:22Z","sha256":"0ce0e9fa2b306adbb7efb5b2fca31ff5a272b913fe31f4d9b31f8934e1cbcd7d","source_id":"us-cfr","stale":true,"prev":"us/46-cfr-52.20-1","next":"us/46-cfr-52.20-25"},"notice":"GroundRules: Original legal text. Not legal advice."}
