{"data":{"id":"us/46-cfr-52.25-7","jurisdiction":"us","citation":"46 CFR 52.25-7","heading":"-7 Electric boilers (modifies PEB-1 through PEB-19).","body":"Electric boilers required to comply with this part must meet the requirements in PEB-1 through PEB-19 except PEB-3 of Section I of the ASME BPVC (incorporated by reference; see § 52.01-1).","path":["Title 46—Shipping","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER F—MARINE ENGINEERING","PART 52—POWER BOILERS","Subpart 52.25—Other Boiler Types"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-46.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:22Z","sha256":"29b183e59740b626831130798131777265e4f2149190427a549cd54ab7b07aab","source_id":"us-cfr","stale":true,"prev":"us/46-cfr-52.25-5","next":"us/46-cfr-52.25-10"},"notice":"GroundRules: Original legal text. Not legal advice."}
