{"data":{"id":"us/46-cfr-58.30-40","jurisdiction":"us","citation":"46 CFR 58.30-40","heading":"-40 Plans.","body":"(a) Diagrammatic plans and lists of materials must be submitted for each of the fluid power and control systems listed in § 58.30-1(a) that is installed on the vessel. Plan submission must be in accordance with subpart 50.20 of this subchapter and must include the following:\n(1) The purpose of the system.\n(2) Its location on the vessel.\n(3) The maximum allowable working pressure.\n(4) The fluid used in the system.\n(5) Details of the system components in accordance with § 56.01-10(d) of this subchapter.\n(b) [Reserved]","path":["Title 46—Shipping","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER F—MARINE ENGINEERING","PART 58—MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS","Subpart 58.30—Fluid Power and Control Systems"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-46.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:22Z","sha256":"d730e5dcf3b0920cdef40050a97cec785d42e5154632857e6c6571ba0b9d302d","source_id":"us-cfr","stale":true,"prev":"us/46-cfr-58.30-35","next":"us/46-cfr-58.30-50"},"notice":"GroundRules: Original legal text. Not legal advice."}
