{"data":{"id":"us/46-cfr-61.30-5","jurisdiction":"us","citation":"46 CFR 61.30-5","heading":"-5 Preparation of thermal fluid heater for inspection and test.","body":"For visual inspection, access plates and manholes must be removed as required by the marine inspector and the heater and combustion chambers must be thoroughly cooled and cleaned.","path":["Title 46—Shipping","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER F—MARINE ENGINEERING","PART 61—PERIODIC TESTS AND INSPECTIONS","Subpart 61.30—Tests and Inspections of Fired Thermal Fluid Heaters"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-46.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:22Z","sha256":"3bedb98eb83ed665db8077c765d3b45ad0b66596a70993200f3fa6d0210a9784","source_id":"us-cfr","stale":true,"prev":"us/46-cfr-61.30-1","next":"us/46-cfr-61.30-10"},"notice":"GroundRules: Original legal text. Not legal advice."}
