{"data":{"id":"us/46-cfr-62.20-1","jurisdiction":"us","citation":"46 CFR 62.20-1","heading":"-1 Plans for approval.","body":"(a) The following plans must be submitted to the Coast Guard for approval in accordance with §§ 50.20-5 and 50.20-10 of this chapter:\n(1) A general arrangement plan of control and monitoring equipment, control locations, and the systems served.\n(2) Control and monitoring console, panel, and enclosure layouts.\n(3) Schematic or logic diagrams including functional relationships, a written description of operation, and sequences of events for all modes of operation.\n(4) A description of control or monitoring system connections to non-vital systems.\n(5) A description of programmable features.\n(6) A description of built-in test features and diagnostics.\n(7) Design Verification and Periodic Safety test procedures described in subpart 61.40 of this subchapter.\n(8) Control system normal and emergency operating instructions.\n(b) [Reserved]","path":["Title 46—Shipping","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER F—MARINE ENGINEERING","PART 62—VITAL SYSTEM AUTOMATION","Subpart 62.20—Plan Submittal"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-46.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:22Z","sha256":"978b90b41acd4b16dd60002c507ae00b430abc0af629bb373f09c064c895fc14","source_id":"us-cfr","stale":true,"prev":"us/46-cfr-62.15-1","next":"us/46-cfr-62.20-3"},"notice":"GroundRules: Original legal text. Not legal advice."}
