{"data":{"id":"us/46-cfr-64.79","jurisdiction":"us","citation":"46 CFR 64.79","heading":"Inspection of pressure and vacuum relief device.","body":"(a) The inspection of the pressure and vacuum relief device required in § 64.77(a) must include—\n(1) Disassembling;\n(2) A visual inspection for defective parts; and\n(3) A test of the accuracy of the pressure setting.\n(b) If the pressure and vacuum relief valve passes the inspection required in paragraph (a) of this section, the owner or his representative may attach to the device a metal tag containing the date of the inspection.","path":["Title 46—Shipping","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER F—MARINE ENGINEERING","PART 64—MARINE PORTABLE TANKS AND CARGO HANDLING SYSTEMS","Subpart E—Periodic Inspections and Tests of MPTs"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-46.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:22Z","sha256":"80f4b23cab47d34ccb8e0c5e025bb68a923b347f86bdc2411f52826dde551a65","source_id":"us-cfr","stale":true,"prev":"us/46-cfr-64.77","next":"us/46-cfr-64.81"},"notice":"GroundRules: Original legal text. Not legal advice."}
