{"data":{"id":"us/46-cfr-64.88","jurisdiction":"us","citation":"46 CFR 64.88","heading":"Plan approval, construction, and inspection of cargo-handling systems.","body":"Plans for the cargo-handling system of a portable tank authorized under subpart 98.30 of this chapter must be approved by the Coast Guard in accordance with the requirements of § 56.01-10 of this subchapter. In addition, the cargo-handling system must be constructed and inspected in accordance with part 56 of this subchapter.","path":["Title 46—Shipping","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER F—MARINE ENGINEERING","PART 64—MARINE PORTABLE TANKS AND CARGO HANDLING SYSTEMS","Subpart F—Cargo Handling System"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-46.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:22Z","sha256":"f51ad0b1006f80e4df8ad6a5a7089fb71118a74de7fe44ee12cac5ba18f15298","source_id":"us-cfr","stale":true,"prev":"us/46-cfr-64.87","next":"us/46-cfr-64.89"},"notice":"GroundRules: Original legal text. Not legal advice."}
