{"data":{"id":"us/47-cfr-101.1009","jurisdiction":"us","citation":"47 CFR 101.1009","heading":"System operations.","body":"(a) The licensee may construct and operate any number of fixed stations anywhere within the area authorized by the license without prior authorization, except as follows:\n(1) A station would be required to be individually licensed if:\n(i) International agreements require coordination;\n(ii) Submission of an Environmental Assessment is required under § 1.1307 of this chapter.\n(iii) The station would affect areas identified in § 1.924 of this chapter.\n(2) Any antenna structure that requires notification to the Federal Aviation Administration (FAA) must be registered with the Commission prior to construction under § 17.4 of this chapter.\n(b) Whenever a licensee constructs or makes system changes as described in paragraph (a) of this section, the licensee is required to notify the Commission within 30 days of the change under § 1.947 of this chapter and include a statement of the technical parameters of the changed station.","path":["Title 47—Telecommunication","CHAPTER I—FEDERAL COMMUNICATIONS COMMISSION","SUBCHAPTER D—SAFETY AND SPECIAL RADIO SERVICES","PART 101—FIXED MICROWAVE SERVICES","Subpart L—Local Multipoint Distribution Service"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-47.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:28Z","sha256":"34981a693909c27eeaf7f00e5aecf91a95fbca30e01c08a367a96b583aa05b42","source_id":"us-cfr","stale":true,"prev":"us/47-cfr-101.1007","next":"us/47-cfr-101.1011"},"notice":"GroundRules: Original legal text. Not legal advice."}
