{"data":{"id":"us/47-cfr-73.212","jurisdiction":"us","citation":"47 CFR 73.212","heading":"Administrative changes in authorizations.","body":"(a) In the issuance of FM broadcast station authorizations, the Commission will specify the transmitter output power and effective radiated power in accordance with the following tabulation:\nPower (watts or kW) Rounded out to nearest figure (watts or kW)\n1 to 3 .05\n3 to 10 .1\n10 to 30 .5\n30 to 100 1\n100 to 300 5\n300 to 1,000 10\n(b) Antenna heights above average terrain will be rounded out to the nearest meter.","path":["Title 47—Telecommunication","CHAPTER I—FEDERAL COMMUNICATIONS COMMISSION","SUBCHAPTER C—BROADCAST RADIO SERVICES","PART 73—RADIO BROADCAST SERVICES","Subpart B—FM Broadcast Stations"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-47.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:28Z","sha256":"76c47f84ae7984acb21290972163797a5933b1e78de00d3b76a3c2688ae67733","source_id":"us-cfr","stale":true,"prev":"us/47-cfr-73.211","next":"us/47-cfr-73.213"},"notice":"GroundRules: Original legal text. Not legal advice."}
