{"data":{"id":"us/47-cfr-87.197","jurisdiction":"us","citation":"47 CFR 87.197","heading":"ELT test procedures.","body":"ELT testing must avoid outside radiation. Bench and ground tests conducted outside of an RF-shielded enclosure must be conducted with the ELT terminated into a dummy load.","path":["Title 47—Telecommunication","CHAPTER I—FEDERAL COMMUNICATIONS COMMISSION","SUBCHAPTER D—SAFETY AND SPECIAL RADIO SERVICES","PART 87—AVIATION SERVICES","Subpart F—Aircraft Stations"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-47.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:28Z","sha256":"a07d05cadb22b4c7aeb21563f9199cbc5e485276e9bfb96aea35dbed423da999","source_id":"us-cfr","stale":true,"prev":"us/47-cfr-87.195","next":"us/47-cfr-87.199"},"notice":"GroundRules: Original legal text. Not legal advice."}
