{"data":{"id":"us/48-cfr-1216.603-4","jurisdiction":"us","citation":"48 CFR 1216.603-4","heading":"1216.603-4 Contract clauses.","body":"The contracting officer shall insert the clause at 1252.216-74, Settlement of Letter Contract, in all definitized letter contracts.","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 12—DEPARTMENT OF TRANSPORTATION","SUBCHAPTER C—CONTRACTING METHODS AND CONTRACT TYPES","PART 1216—TYPES OF CONTRACTS","Subpart 1216.6—Time-and-Materials, Labor-Hour, and Letter Contracts"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"a0028945d846a6ce9e1a4c65719b8891770a76ac1158def1ef6094e993f206bd","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-1216.603","next":"us/48-cfr-1217.7000"},"notice":"GroundRules: Original legal text. Not legal advice."}
