{"data":{"id":"us/48-cfr-1217.7000","jurisdiction":"us","citation":"48 CFR 1217.7000","heading":"1217.7000 Definition.","body":"Lay Days means time allowed to the master of a vessel for loading and unloading the same.","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 12—DEPARTMENT OF TRANSPORTATION","SUBCHAPTER C—CONTRACTING METHODS AND CONTRACT TYPES","PART 1217—SPECIAL CONTRACTING METHODS","Subpart 1217.70—Fixed-Price Contracts for Vessel Repair, Alteration, or Conversion"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"b0818fa787c3608489eb0787ba80c60ed3a32ed81599bad7b617437283d588af","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-1216.603-4","next":"us/48-cfr-1217.7001"},"notice":"GroundRules: Original legal text. Not legal advice."}
