{"data":{"id":"us/48-cfr-1228.307-1","jurisdiction":"us","citation":"48 CFR 1228.307-1","heading":"1228.307-1 Group insurance plans.","body":"(a) Prior approval requirements. Contractors shall provide plans required by FAR 28.307-1(a) to the contracting officer for approval.","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 12—DEPARTMENT OF TRANSPORTATION","SUBCHAPTER E—GENERAL CONTRACTING REQUIREMENTS","PART 1228—BONDS AND INSURANCE","Subpart 1228.3—Insurance"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"47a7699a81f8d52a15fce474768c5094639fe43e233f3f604770fbc6857b29eb","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-1228.306-70","next":"us/48-cfr-1228.311-1"},"notice":"GroundRules: Original legal text. Not legal advice."}
