{"data":{"id":"us/48-cfr-1309.405-1","jurisdiction":"us","citation":"48 CFR 1309.405-1","heading":"1309.405-1 Continuation of current contracts.","body":"(a) The designee authorized to direct the discontinuance of a contract or subcontract because of a debarment, suspension or proposed debarment is set forth in CAM 1301.70.\n(b) A written determination must be issued by the designee authorized in CAM 1301.70 before the following actions can be taken with a contractor that is debarred, suspended or proposed for debarment:\n(1) Place any orders exceeding the maximum on an indefinite delivery contract;\n(2) Place orders under Federal supply schedule contracts, blanket purchase orders or basic ordering agreements; or\n(3) Add new work or exercise options that extend the duration of a current contract or order.","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 13—DEPARTMENT OF COMMERCE","SUBCHAPTER B—COMPETITION AND ACQUISITION PLANNING","PART 1309—CONTRACTOR QUALIFICATIONS","Subpart 1309.4—Debarment, Suspension, and Ineligibility"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"61d5a99f1504841b70f77434138f08b2a19e2593fcac8f491d11434707ed0c10","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-1309.405","next":"us/48-cfr-1309.405-2"},"notice":"GroundRules: Original legal text. Not legal advice."}
