{"data":{"id":"us/48-cfr-1313.302-3","jurisdiction":"us","citation":"48 CFR 1313.302-3","heading":"1313.302-3 Obtaining contractor acceptance and modifying purchase orders.","body":"A contractor's written acceptance of a purchase order modification is required, unless the contracting officer determines otherwise.","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 13—DEPARTMENT OF COMMERCE","SUBCHAPTER C—CONTRACTING METHODS AND CONTRACT TYPES","PART 1313—SIMPLIFIED ACQUISITION PROCEDURES","Subpart 1313.3—Simplified Acquisitions Methods"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"0a05a4d65b0144d6ae4fc16eb9a14e2d51e5b9fd9c61e4663050985fd893d233","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-1313.302-1-70","next":"us/48-cfr-1313.303"},"notice":"GroundRules: Original legal text. Not legal advice."}
