{"data":{"id":"us/48-cfr-1315.305","jurisdiction":"us","citation":"48 CFR 1315.305","heading":"1315.305 Proposal evaluation.","body":"At the discretion of the contracting officer, cost information may be provided to members of the technical evaluation team.","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 13—DEPARTMENT OF COMMERCE","SUBCHAPTER C—CONTRACTING METHODS AND CONTRACT TYPES","PART 1315—CONTRACTING BY NEGOTIATION","Subpart 1315.3—Source Selection"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"a9f203d33c8900443178e73e7720a9fe27db62946e6315e7b93066f616720d8d","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-1315.303","next":"us/48-cfr-1315.407"},"notice":"GroundRules: Original legal text. Not legal advice."}
