{"data":{"id":"us/48-cfr-1334.005-6","jurisdiction":"us","citation":"48 CFR 1334.005-6","heading":"1334.005-6 Full production.","body":"The designee authorized to reaffirm mission need and program objectives and grant approval to proceed with the award of a contract for full production of a successfully tested major system is set forth in CAM 1301.70.","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 13—DEPARTMENT OF COMMERCE","SUBCHAPTER F—SPECIAL CATEGORIES OF CONTRACTING","PART 1334—MAJOR SYSTEM ACQUISITION","Subpart 1334.0—General"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"4f1921378cea594652507b5b5ea6701ad9d4cd794ff673911dcb66b4d46eaf9c","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-1334.005","next":"us/48-cfr-1334.201"},"notice":"GroundRules: Original legal text. Not legal advice."}
