{"data":{"id":"us/48-cfr-1348.102","jurisdiction":"us","citation":"48 CFR 1348.102","heading":"1348.102 Policies.","body":"(a) Contracting activities shall send contractor-submitted Value Engineering Change Proposals (VECPs) to the appropriate technical personnel for review.\n(b) Technical personnel shall conduct a comprehensive review of VECPs for technical feasibility, usefulness, and adequacy of the contractor's estimate of cost savings; make a written report; and recommend acceptance or rejection to the contracting officer.\n(c) The designee authorized to grant exemptions from value engineering provisions in appropriate supply, service, architect-engineer and construction contracts is set forth in CAM 1301.70.","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 13—DEPARTMENT OF COMMERCE","SUBCHAPTER G—CONTRACT MANAGEMENT","PART 1348—VALUE ENGINEERING","Subpart 1348.1—Policies and Procedures"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"b7eabfab4a0b15724f65696ed45ded1dd3fc15a804fba1c211ff1e70cf9ec2c4","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-1346.710","next":"us/48-cfr-1348.201"},"notice":"GroundRules: Original legal text. Not legal advice."}
