{"data":{"id":"us/48-cfr-1409.405","jurisdiction":"us","citation":"48 CFR 1409.405","heading":"1409.405 Effect of listing.","body":"When a CO finds that a compelling reason exists to conduct business with a contractor listed on the EPLS, the HCA shall submit the determination and findings to the Director, PAM, for approval.","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 14—DEPARTMENT OF THE INTERIOR","SUBCHAPTER B—COMPETITION AND ACQUISITION PLANNING","PART 1409—CONTRACTOR QUALIFICATIONS","Subpart 1409.4—Debarment, Suspension, and Ineligibility"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"8fc2efdc9ab2a7da0a011756833aa931d77510ad190c15298e498783e59bb9f3","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-1409.404","next":"us/48-cfr-1409.405-1"},"notice":"GroundRules: Original legal text. Not legal advice."}
