{"data":{"id":"us/48-cfr-1414.404-1","jurisdiction":"us","citation":"48 CFR 1414.404-1","heading":"1414.404-1 Cancellation of invitations after opening.","body":"The CCO is authorized to make the written determination to cancel the IFB before award but after bid opening.","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 14—DEPARTMENT OF THE INTERIOR","SUBCHAPTER C—CONTRACTING METHODS AND CONTRACT TYPES","PART 1414—SEALED BIDDING","Subpart 1414.4—Opening of Bids and Award of Contract"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"6ba4c31febae8a75869f30bc34ad01afa285bbae48d87377777c557775c4e356","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-1414.404","next":"us/48-cfr-1414.407"},"notice":"GroundRules: Original legal text. Not legal advice."}
