{"data":{"id":"us/48-cfr-1416.203-4","jurisdiction":"us","citation":"48 CFR 1416.203-4","heading":"1416.203-4 Contract clauses.","body":"An economic price adjustment clause based on actual cost of labor or material may be used after approval by the BPC, without the power of redelegation.","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 14—DEPARTMENT OF THE INTERIOR","SUBCHAPTER C—CONTRACTING METHODS AND CONTRACT TYPES","PART 1416—TYPES OF CONTRACTS","Subpart 1416.2—Fixed-Price Contracts"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"08ff53b7439f3b38bdf68f5cb5e498fc821a69dd42b292e91f4f16a69f6936d9","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-1416.203","next":"us/48-cfr-1416.405"},"notice":"GroundRules: Original legal text. Not legal advice."}
