{"data":{"id":"us/48-cfr-1432.102","jurisdiction":"us","citation":"48 CFR 1432.102","heading":"1432.102 Description of contract financing methods.","body":"Use of progress payments based on a percentage or stage of completion are authorized for construction contracts. Progress payments for other than construction, alteration, and repair contracts require the CO to write a determination that:\n(a) Payments based on costs would be impracticable; and\n(b) Adequate measures exist for determining quality standards and the percentage of work accomplished.","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 14—DEPARTMENT OF THE INTERIOR","SUBCHAPTER E—GENERAL CONTRACTING REQUIREMENTS","PART 1432—CONTRACT FINANCING","Subpart 1432.1—Non-Commercial Item Purchase Financing"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"973c072fb5cd007e511a6dc2f77ca0a9fcb92b1439c9754df2a660ad3a3e1840","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-1431.101","next":"us/48-cfr-1432.304"},"notice":"GroundRules: Original legal text. Not legal advice."}
