{"data":{"id":"us/48-cfr-1436.602-5","jurisdiction":"us","citation":"48 CFR 1436.602-5","heading":"1436.602-5 Short selection processes for contracts not to exceed the simplified acquisition threshold.","body":"At each occurrence, CO approval shall be obtained prior to the utilization of either of the short selection processes used for architect-engineer contracts not expected to exceed the simplified acquisition threshold.","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 14—DEPARTMENT OF THE INTERIOR","SUBCHAPTER F—SPECIAL CATEGORIES OF CONTRACTING","PART 1436—CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS","Subpart 1436.6—Architect-Engineer Services"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"dfbfb8bad64bb1d947263d466e624251610d099b1aa714ce6634fa4b84d15bf9","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-1436.602-4","next":"us/48-cfr-1436.603"},"notice":"GroundRules: Original legal text. Not legal advice."}
