{"data":{"id":"us/48-cfr-1509.407-3","jurisdiction":"us","citation":"48 CFR 1509.407-3","heading":"1509.407-3 Procedures.","body":"The procedures prescribed in 1509.406-3(a) shall be followed under conditions which appear to warrant suspension of a Contractor.","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 15—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER B—ACQUISITION PLANNING","PART 1509—CONTRACTOR QUALIFICATIONS","Subpart 1509.4—Debarment, Suspension and Ineligibility"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"20278cbdd35219290820098143cef16b138521b34d0230101ef2b758b08a32a2","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-1509.407","next":"us/48-cfr-1509.500"},"notice":"GroundRules: Original legal text. Not legal advice."}
