{"data":{"id":"us/48-cfr-1515.404-475","jurisdiction":"us","citation":"48 CFR 1515.404-475","heading":"1515.404-475 Cost realism.","body":"The EPA structured approach is not required when the contracting officer is evaluating cost realism in a competitive acquisition.","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 15—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER C—CONTRACTING METHODS AND CONTRACT TYPES","PART 1515—CONTRACTING BY NEGOTIATION","Subpart 1515.4—Contract Pricing"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"20ca064720e02ce5fceeb982ce2b3fbed20adf3a293cf18e9fc776626b9c3556","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-1515.404-474","next":"us/48-cfr-1515.408"},"notice":"GroundRules: Original legal text. Not legal advice."}
