{"data":{"id":"us/48-cfr-18.107","jurisdiction":"us","citation":"48 CFR 18.107","heading":"18.107 AbilityOne specification changes.","body":"Contracting officers are not held to the notification required when changes in AbilityOne specifications or descriptions are required to meet emergency needs. (See 8.712(d).)","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 1—FEDERAL ACQUISITION REGULATION","SUBCHAPTER C—CONTRACTING METHODS AND CONTRACT TYPES","PART 18—EMERGENCY ACQUISITIONS","Subpart 18.1—Available Acquisition Flexibilities"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"3ab344ecbfdb5ab786a4e5a8878e1e04782f611aa19b0b8b901e45d29d21ea2f","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-18.106","next":"us/48-cfr-18.108"},"notice":"GroundRules: Original legal text. Not legal advice."}
