{"data":{"id":"us/48-cfr-1843.205","jurisdiction":"us","citation":"48 CFR 1843.205","heading":"1843.205 Contract clauses.","body":"As authorized in the prefaces of clauses FAR 52.243-1, Changes—Fixed Price; FAR 52.243-2, Changes—Cost Reimbursement; and FAR 52.243-4, Changes; and in the prescription at 43.205(c) for FAR 52.243-3, Changes—Time-and-Material or Labor-Hours, the period within which a contractor must assert its right to an equitable adjustment may be varied not to exceed 60 calendar days.","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 18—NATIONAL AERONAUTICS AND SPACE ADMINISTRATION","SUBCHAPTER G—CONTRACT MANAGEMENT","PART 1843—CONTRACT MODIFICATIONS","Subpart 1843.2—Change Orders"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"6c5471cdc628a2699bfbc8e6258821deb4d0a382257fc5a2c1260425b799a2d0","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-1842.7202","next":"us/48-cfr-1843.205-70"},"notice":"GroundRules: Original legal text. Not legal advice."}
