{"data":{"id":"us/48-cfr-1846.672-2","jurisdiction":"us","citation":"48 CFR 1846.672-2","heading":"1846.672-2 Consolidated shipments.","body":"When individual shipments are held at the contractor's plant for authorized transportation consolidation to a single destination on a single bill of lading, the applicable DD Forms 250 may be prepared at the time of CQA or acceptance prior to the time of actual shipment (see Block 3).","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 18—NATIONAL AERONAUTICS AND SPACE ADMINISTRATION","SUBCHAPTER G—CONTRACT MANAGEMENT","PART 1846—QUALITY ASSURANCE","Subpart 1846.6—Material Inspection and Receiving Reports"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"55e3fefb6aff0de0f9586efe4e5bc86be33a2e858f736a9501136597aa1348a9","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-1846.672-1","next":"us/48-cfr-1846.672-3"},"notice":"GroundRules: Original legal text. Not legal advice."}
