{"data":{"id":"us/48-cfr-1852.236-73","jurisdiction":"us","citation":"48 CFR 1852.236-73","heading":"1852.236-73 Hurricane plan.","body":"As prescribed in 1836.570(c), insert the following clause:\nHurricane Plan (DEC 1988)\nIn the event of a hurricane warning, the Contractor shall—\n(a) Inspect the area and place all materials possible in a protected location;\n(b) Tie down, or identify and store, all outside equipment and materials;\n(c) Clear all surrounding areas and roofs of buildings, or tie down loose material, equipment, debris, and any other objects that could otherwise be blown away or blown against existing buildings; and\n(d) Ensure that temporary erosion controls are adequate.\n(End of clause)","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 18—NATIONAL AERONAUTICS AND SPACE ADMINISTRATION","SUBCHAPTER H—CLAUSES AND FORMS","PART 1852—SOLICITATION PROVISIONS AND CONTRACT CLAUSES","Subpart 1852.2—Texts of Provisions and Clauses"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"b46d3251e1ff163cd134481564c2817f0f33e87fac0ece3b01594d7ffe13484b","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-1852.236-72","next":"us/48-cfr-1852.236-74"},"notice":"GroundRules: Original legal text. Not legal advice."}
