{"data":{"id":"us/48-cfr-2009.405-1","jurisdiction":"us","citation":"48 CFR 2009.405-1","heading":"2009.405-1 Continuation of current contracts.","body":"The Head of the Contracting Activity is authorized to make the determination to continue contracts or subcontracts in existence at the time the contractor was debarred, suspended, or proposed for debarment in accordance with FAR 9.405-1.","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 20—NUCLEAR REGULATORY COMMISSION","SUBCHAPTER B—COMPETITION AND ACQUISITION PLANNING","PART 2009—CONTRACTOR QUALIFICATIONS","Subpart 2009.4—Debarment, Suspension, and Ineligibility"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"62362a9f4de46cd1a788539fff0dd62d45f3ba8e9137c8e3a87f402300253fcc","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-2009.405","next":"us/48-cfr-2009.405-2"},"notice":"GroundRules: Original legal text. Not legal advice."}
