{"data":{"id":"us/48-cfr-225.202","jurisdiction":"us","citation":"48 CFR 225.202","heading":"225.202 Exceptions.","body":"(a)(2) A nonavailability determination is not required for construction materials listed in FAR 25.104(a). For other materials, a nonavailability determination shall be approved at the levels specified in 225.103(b)(ii). Use the estimated value of the construction materials to determine the approval level. A nonavailability determination is not required before January 1, 2030, if there is an offer for foreign construction material that exceeds 55 percent domestic content (also see FAR 25.204(b)(1)(ii) and (b)(2)(ii)).","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 2—DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE","SUBCHAPTER D—SOCIOECONOMIC PROGRAMS","PART 225—FOREIGN ACQUISITION","Subpart 225.2—Buy American—Construction Materials"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"0dd82f6ec01b3214be80f48614b2ef82966bfc48ae6ae7e4741d4717d9645b42","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-225.170","next":"us/48-cfr-225.206"},"notice":"GroundRules: Original legal text. Not legal advice."}
